Tarion QFE + Enrolment Confirmation — builder must be HCRA-licensed first, then qualify and enrol each home before excavation/foundation
Created 2026-05-24
Claim: Two-step builder authorization for new-home construction in Ontario:
- HCRA licence — required to legally build or sell new homes (see HCRA licensing requirements: technical competency, financial responsibility, conduct history, honest disclosure, licensing interview).
- Tarion QFE + Enrolment Confirmation — required for each home:
- Qualification for Enrolment (QFE) Confirmation before agreeing to sell or starting construction.
- Enrolment Confirmation before excavating or beginning the foundation.
- Municipalities generally will not issue building permits without Enrolment Confirmation.
Builder obligations (ongoing):
- HCRA-licensed and Tarion-enrolled for every home before sale or construction.
- Attach the Warranty Information Sheet and addendum to every APS (mandatory since Feb 1, 2021).
- Conduct the PDI with the buyer or their designate (Pre-Delivery Inspection (PDI) — mandatory pre-possession walkthrough; PDI Form is not a warranty claim but failure to note items makes proof harder).
- Repair warranted items within the builder repair periods (120 days standard, 30 days post-conciliation, 90 days for MSD discussion).
- Respond to Tarion information requests during conciliation; provide drawings, specs, trade info.
- Must not block homeowner access to Tarion forms or coerce buyers into waiving warranty rights.
Source: https://builderportal.hcraontario.ca/en-US/faq/; Tarion QFE documentation.
Confidence: Verified.
Builder-specific security: Tarion's QFE process can require additional security (letters of credit, security deposits) set in a Notice of Proposal of Conditions, based on a risk profile. New builders typically face higher security requirements than established licensees.
Companion: HCRA + Tarion are two distinct gates — an Ontario new-home builder needs both to legally build or sell for the rule that both gates are required.
Related
- reference HCRA licensing requirements: technical competency, financial responsibility, conduct history, honest disclosure, licensing interview
- reference Pre-Delivery Inspection (PDI) — mandatory pre-possession walkthrough; PDI Form is not a warranty claim but failure to note items makes proof harder